Riverside County · 10 to 15 minutes from our office
Manufactured homes in Temecula
Clayton, Fleetwood and Skyline floor plans with the price shown on every one, delivered and installed by our licensed contractors, with the permits run by us. Transparent pricing. One team from plan to move-in.
- Permits
- Riverside County · city or county building department (we handle it)
- From our Murrieta office
- 10 to 15 minutes from our office
- From the Clayton plant (Perris)
- about 35 minutes
- From the Fleetwood plant (Riverside)
- about 50 minutes
- From the Skyline plant (San Jacinto)
- about 45 minutes
Who issues the permits
The City of Temecula's Building and Safety department permits homes inside the city; De Luz, Rainbow-adjacent hills and the wine-country parcels east of town are permitted by Riverside County.
What the lots are like
City lots typically mean an ADU behind an existing house. The De Luz and wine-country side is acreage, where a CrossMod home or a spacious Encore or Vogue II double-wide with a porch fits the setting.
Good to know
Well and septic are common on the acreage side, which affects utilities and set-up cost. Tell us which side of town you are on and we will scope the estimate accordingly.
Official permit and application resources
Issuing agency: City of Temecula Community Development — Building and Safety
Purpose: Find the City building permit application and supporting Building and Safety forms and handouts.
Jurisdiction: City of Temecula resource for parcels within its permitting jurisdiction. A Temecula mailing address does not establish city jurisdiction; confirm the parcel with the City. County, special-district and park enforcement reviews can be separate. For park installation, confirm HCD or the authorized local enforcement agency.
Link checked October 20, 2026. Use the agency’s current forms and instructions. Confirm the required application category, form revision, supporting plans and inspection steps with that agency. These are outgoing official links; Net Cost does not host the forms. A listed resource does not establish parcel eligibility, a complete submittal or permit approval.